Nearly two years since we installed this soft start at a glass factory, for the 11kV 1.5MW compressor.
So I returned this week for it’s first service, and everything is working flawlessly.
Made some thermal checks on the LV cabinet, made a backup up file for the protection relay and our parameter settings for the customer.
When this was installed, it was an absolute game changer for the client as without it they would never have been able to start their shiny new compressor as a DOL start would have tripped the protection relays, as they were at near peak loading.


