RENEWABLE ENERGY – HAZARDOUS AREA – INDUSTRIAL AUTOMATION – PANEL BUILDING

All Products

Flterable Category List Of DS Energy Products

Control Solutions

Control System Designs By DS Energy

Junction Boxes

Junction Boxes Supplied By DS Energy

Automation Solutions

Products To Automate Your Process

Enclosures

ATEX Enclosures by DS Energy

Client Solutions

Clients Solutions Developed By DS Energy

In Hire Fleet

Hire Euipment To Reduce Project Costs

Our Brochure

View Our Latest Brochure

DS Energy Services

View Our Services

ATEX System Design

System Designs By Softstart UK

Service Engineers

Softstart UK LV & MC Expert Service Engineers

Product Training

Available Training Services

Panel Design

Comprehensive Panel Designs

Oil & Gas Industry

DS Energy Oil & Gas Industry Services

High Quality Technical Support

Phone Support & Application Selection

Software Design

PLC & HMI Programming, Fieldbus Support

Renewable Energy

View Our Renewable Energy Services

DS Energy Downloads

Download Manuals, Software, Drivers & Code

Support Links

List Of Useful Support Links

Our Distributors

List Of Our Distributors

Our Brochure

View Our Latest Brochure

Project: Energy-Saving Plant Upgrade for Major Service Operator

Project Overview

A large service provider was experiencing operational and start-up issues with mobile steam boilers due to insufficient on-site electrical capacity.

Challenge:

The high demand during motor start-up created significant strain on available power, limiting reliability and efficiency.

Solution:

DS Energy was engaged to redesign the electrical soft-start system and explore alternative configurations to reduce start-up energy requirements. Our team recently overhauled a pair of Exd Zone 1 certified units for the client, supporting 75 kW motor soft starters used on saltwater pumps.

The project involved reconfiguring the units from a line-to-inside-Delta setup, delivering a 33% reduction in the soft starter’s starting current.

To minimize downtime and logistical complexity, we opted to transport the entire skid to our yard for refurbishment. This approach allowed us to execute the modifications in-house without the challenges of lifting the frames out on-site.

Features:

Key upgrades included:

  • Installation of new isolators and circuit breakers

  • Downsizing of cabling for improved efficiency

  • Integration of new Exe boxes, strategically placed for streamlined connectivity of power, motor, and remote I/O terminals

The redesigned system provided significant reductions in start-up current, resolving the client’s electrical capacity challenges while improving operational reliability. The project not only ensured compliance with Exd Zone 1 requirements but also delivered a more efficient and maintainable setup for future operations.